New Space To Do: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 1: | Line 1: | ||
==Break Area== | ==Break Area== | ||
*Replace burned-out 4' lamps | *<s>Replace burned-out 4' lamps</s> | ||
*clean up 8' table | *clean up 8' table | ||
*find home for microwave | *find home for microwave | ||
Line 12: | Line 12: | ||
* <s>Unpack remaining items/tooling for milling/lathe </s> - Thank Gabe | * <s>Unpack remaining items/tooling for milling/lathe </s> - Thank Gabe | ||
*design ventilation system | *design ventilation system | ||
*label metalworking shelving | *label metalworking shelving - and organize | ||
*figure out what metal screws are needed in radioshack cabinet. What should we stock? | *figure out what metal screws are needed in radioshack cabinet. What should we stock? | ||
*<s>Move old woodworking shelf as temporary material storage</s> | *<s>Move old woodworking shelf as temporary material storage</s> | ||
*design/build new metal material storage rack | *design/build new metal material storage rack | ||
*put feet on temporary metal storage rack | |||
*<s>paint wall above welding area flat black</s> | *<s>paint wall above welding area flat black</s> | ||
Line 28: | Line 29: | ||
*design/build outfeed table for tablesaw | *design/build outfeed table for tablesaw | ||
*design/build new base for planer | *design/build new base for planer | ||
*center up light over storage area | |||
==Arts/Crafts== | ==Arts/Crafts== | ||
Line 45: | Line 47: | ||
*attach tabletop to table | *attach tabletop to table | ||
*relocate track lighting | *relocate track lighting | ||
*paint rear wall in space monochrome color to not look shabby | |||
==General== | ==General== | ||
Line 58: | Line 60: | ||
*use new modem for wireless? | *use new modem for wireless? | ||
*add printer to network | *add printer to network | ||
*break down cardboard boxes | |||
*load up extra shelf parts and put in storage | |||
*repair air compressor cart | |||
==Non-specific== | ==Non-specific== |
Revision as of 00:53, 29 May 2016
Break Area
Replace burned-out 4' lamps- clean up 8' table
- find home for microwave
do we get rid of coffee equipment? Hasn't been used in yearsFind a home for coffee stuff.reduce shelving density in small shelves by entrance- Add signage to space doors about alarm and police.
Metalworking Area
- Coordinate with PCB Rob to bring in additional equipment.
DesignRob has welding table design from online - build welding tableUnpack remaining items/tooling for milling/lathe- Thank Gabe- design ventilation system
- label metalworking shelving - and organize
- figure out what metal screws are needed in radioshack cabinet. What should we stock?
Move old woodworking shelf as temporary material storage- design/build new metal material storage rack
- put feet on temporary metal storage rack
paint wall above welding area flat black
Woodworking Area
- unpack/organize hand tools
- design/build stand for drill press
- design/build wood storage
- design dust collection system
- label hack-rack in woodworking area
- label woodworking tool storage
- figure out what wood screws are needed in radioshack cabinet. What should we stock?
- design/build outfeed table for tablesaw
- design/build new base for planer
- center up light over storage area
Arts/Crafts
unpack boxes and relocate to shoebox bins (nothing should remain on member storage shelves)Thanks Joe!- design/build sewing table with storage for sewing machines and supplies
- what should 4th table be? Another work table? another sewing table? Leatherworking/other?
- Replace table-tops for work tables. LDPE $51 each @ piedmont plastics.
Electronics
- unpack items and sort into shoebox bins - Partially finished
find home for radioshack shelvesOne bin remaining. Good use for it?
Classroom
locate and mount projector screens- locate and mount projector
(s) - unstack chairs
- attach tabletop to table
- relocate track lighting
- paint rear wall in space monochrome color to not look shabby
General
repair light fixture on arts/crafts table. Ends fixed, needs new ballast.relocate lighting on front tablerelocate lighting in arts/crafts area to one per table (four tables by design) - Partially finished- relocate lighting in classroom (after projector/screen location)
set up wireless network (do we have the appropriate routers for what we need?)- get tools working on network again (3d printer/laser cutter)
add sign to network?- hang posters/signs/other decorations
- use new modem for wireless?
- add printer to network
- break down cardboard boxes
- load up extra shelf parts and put in storage
- repair air compressor cart
Non-specific
- Lasercut/Magnetic member storage signs?
- make signs for member storage area that indicate storage on top of shelves not permitted
design 3D printable part that can be used as divider in radioshack cabinetsMaybe just use boxes with flat dividers, rather than labeled dividers.