New Space To Do: Difference between revisions

From Knox Makers Wiki
Jump to navigation Jump to search
Line 23: Line 23:
==Arts/Crafts==
==Arts/Crafts==
*Get art supplies together for open art night
*Get art supplies together for open art night
*Add leather working station (design/build table)
*Add leather working station
*Move metalworking tools into metalworking area, move fabric arts supplies to shelves
*Build 3rd work table (one just like the low table?)
*Build 3rd work table
*Get plastic top for work table and leather working table
*Get plastic top for work table and leather working table



Revision as of 19:32, 14 October 2016

Break Area

  • Add signage to space doors about alarm and police.
  • replace broken couch with one newer ones (can someone find a free one?)

Metalworking Area

  • Rob has welding table design from online - build welding table
  • design filtration system (Has this been designed?)
  • label metalworking shelving - and organize
  • figure out what metal screws are needed in radioshack cabinet. What should we stock?
  • design/build new metal material storage rack (low priority, use old wood rack for now)
  • add new circuits for tools (who has taken charge of this?)
  • design/build general metalworking tables (I know Rob has built one for tools)
  • find filter for metal shopvac (does this need a cloth/paper type filter? or are most metals heavy enough that we don't need a filter? or I may be missing the point)

Woodworking Area

  • unpack/organize hand tools
  • label woodworking tool storage
  • figure out what wood screws are needed in radioshack cabinet. What should we stock?
  • repair combo sander
  • build out-feed table for new table saw

Arts/Crafts

  • Get art supplies together for open art night
  • Add leather working station
  • Build 3rd work table (one just like the low table?)
  • Get plastic top for work table and leather working table

Classroom

  • Repair/replace projectors
  • paint wall
  • move projector and screen

Electronics

General

  • get tools working on network again (3d printer/laser cutter)
  • use new modem for wireless?
  • Add new circuit and hang emergency lighting
  • Add lighting to new space.
  • re-arrange lighting in existing spaces
  • Get fire extinguishers
  • Get more eye protection
  • Get more hearing protection
  • add emergency release cable to roll-up door
  • label hack-rack
  • add cleaning stations to every area (broom, dustpan)

Non-specific

  • Lasercut/Magnetic member storage signs?
  • pressure wash the entry way to the space to clean it up a bit