New Space To Do: Difference between revisions
Jump to navigation
Jump to search
Line 15: | Line 15: | ||
*Move old woodworking shelf as temporary material storage | *Move old woodworking shelf as temporary material storage | ||
*design/build new metal material storage rack | *design/build new metal material storage rack | ||
*paint wall above welding area flat black | |||
==Woodworking Area== | ==Woodworking Area== |
Revision as of 02:38, 22 May 2016
Break Area
- Replace burned-out 4' lamps
- clean up 8' table
- find home for microwave
do we get rid of coffee equipment? Hasn't been used in yearsFind a home for coffee stuff.reduce shelving density in small shelves by entrance
Metalworking Area
- Coordinate with PCB Rob to bring in additional equipment.
DesignRob has welding table design from online - build welding tableUnpack remaining items/tooling for milling/lathe- Thank Gabe- design ventilation system
- label metalworking shelving
- figure out what metal screws are needed in radioshack cabinet. What should we stock?
- Move old woodworking shelf as temporary material storage
- design/build new metal material storage rack
- paint wall above welding area flat black
Woodworking Area
- unpack/organize hand tools
- design/build stand for drill press
- design/build wood storage
- design dust collection system
- label hack-rack in woodworking area
- label woodworking tool storage
- figure out what wood screws are needed in radioshack cabinet. What should we stock?
- design/build outfeed table for tablesaw
- design/build new base for planer
Arts/Crafts
unpack boxes and relocate to shoebox bins (nothing should remain on member storage shelves)Thanks Joe!- design/build sewing table with storage for sewing machines and supplies
- what should 4th table be? Another work table? another sewing table? Leatherworking/other?
- Replace table-tops for work tables. LDPE $51 each @ piedmont plastics.
Electronics
- unpack items and sort into shoebox bins - Partially finished
find home for radioshack shelvesOne bin remaining. Good use for it?
Classroom
- locate and mount projector screens
- locate and mount projector(s)
- unstack chairs
- attach tabletop to table
- relocate track lighting
General
repair light fixture on arts/crafts tableEnds fixed, needs new ballast.- relocate lighting on front table
- relocate lighting in arts/crafts area to one per table (four tables by design) - Partially finished
- relocate lighting in classroom (after projector/screen location)
- set up wireless network (do we have the appropriate routers for what we need?)
- get tools working on network again (3d printer/laser cutter)
- add sign to network?
- hang posters/signs/other decorations
Non-specific
- Lasercut/Magnetic member storage signs?
- make signs for member storage area that indicate storage on top of shelves not permitted
design 3D printable part that can be used as divider in radioshack cabinetsMaybe just use boxes with flat dividers, rather than labeled dividers.