New Space To Do: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 20: | Line 20: | ||
*figure out what wood screws are needed in radioshack cabinet. What should we stock? | *figure out what wood screws are needed in radioshack cabinet. What should we stock? | ||
*Finish outfeed table for tablesaw | *Finish outfeed table for tablesaw | ||
*add new circuits for tools | *add new circuits for tools | ||
Line 29: | Line 28: | ||
==Classroom== | ==Classroom== | ||
==Electronics== | ==Electronics== | ||
==General== | ==General== | ||
Line 43: | Line 42: | ||
==Non-specific== | ==Non-specific== | ||
*Lasercut/Magnetic member storage signs? | *Lasercut/Magnetic member storage signs? | ||
Revision as of 23:12, 29 June 2016
Break Area
- Take out recycling
- Add signage to space doors about alarm and police.
Metalworking Area
- Coordinate with PCB Rob to bring in additional equipment.
- Rob has welding table design from online - build welding table
- design filtration system
- label metalworking shelving - and organize
- figure out what metal screws are needed in radioshack cabinet. What should we stock?
- Rotate old wooden storage for metalworking
- design/build new metal material storage rack (low priority, use old wood rack for now)
- add new circuits for tools
Woodworking Area
- unpack/organize hand tools
- build stand for drill press
- label hack-rack in woodworking area
- label woodworking tool storage
- figure out what wood screws are needed in radioshack cabinet. What should we stock?
- Finish outfeed table for tablesaw
- add new circuits for tools
Arts/Crafts
- build sewing table with storage for sewing machines and supplies
Classroom
Electronics
General
- get tools working on network again (3d printer/laser cutter)
- hang up laser cut gear board
- use new modem for wireless?
- break down cardboard boxes and take to recycling
- unload extra shelf parts
- Add new circuit and hang emergency lighting
Non-specific
- Lasercut/Magnetic member storage signs?