New Space To Do: Difference between revisions

From Knox Makers Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
==Break Area==
==Break Area==
*<s>Replace burned-out 4' lamps</s>
*<s>Replace burned-out 4' lamps</s>
*clean up 8' table
*<s>clean up 8' table</s>
*find home for microwave
*<s>find home for microwave</s>
* <s>do we get rid of coffee equipment?  Hasn't been used in years </s>  Find a home for coffee stuff.
* <s>do we get rid of coffee equipment?  Hasn't been used in years </s>  Find a home for coffee stuff.
* <s>reduce shelving density in small shelves by entrance</s>
* <s>reduce shelving density in small shelves by entrance</s>
Line 11: Line 11:
* <s>Design</s> Rob has welding table design from online - build welding table
* <s>Design</s> Rob has welding table design from online - build welding table
* <s>Unpack remaining items/tooling for milling/lathe </s> - Thank Gabe
* <s>Unpack remaining items/tooling for milling/lathe </s> - Thank Gabe
*design ventilation system
*design <s>ventilation</s> filtration system
*label metalworking shelving - and organize
*label metalworking shelving - and organize
*figure out what metal screws are needed in radioshack cabinet.  What should we stock?
*figure out what metal screws are needed in radioshack cabinet.  What should we stock?
*<s>Move old woodworking shelf as temporary material storage</s>
*<s>Move old woodworking shelf as temporary material storage</s>
*design/build new metal material storage rack
*design/build new metal material storage rack (low priority, use old wood rack for now)
*put feet on temporary metal storage rack
*<s>put feet on temporary metal storage rack</s>
*<s>paint wall above welding area flat black</s>
*<s>paint wall above welding area flat black</s>


Line 38: Line 38:


==Electronics==
==Electronics==
*unpack items and sort into shoebox bins - Partially finished
*<s>unpack items and sort into shoebox bins - Partially finished</s>
*<s>find home for radioshack shelves </s> One bin remaining.  Good use for it?
*<s>find home for radioshack shelves </s> <s>One bin remaining.  Good use for it?</s>


==Classroom==
==Classroom==
Line 45: Line 45:
*locate and mount projector<s>(s)</s>
*locate and mount projector<s>(s)</s>
*unstack chairs
*unstack chairs
*attach tabletop to table
*<s>attach tabletop to table</s>
*relocate track lighting
*relocate track lighting
*paint rear wall in space monochrome color to not look shabby
*<s>paint rear wall in space monochrome color to not look shabby</s>


==General==
==General==

Revision as of 00:13, 7 June 2016

Break Area

  • Replace burned-out 4' lamps
  • clean up 8' table
  • find home for microwave
  • do we get rid of coffee equipment? Hasn't been used in years Find a home for coffee stuff.
  • reduce shelving density in small shelves by entrance
  • Add signage to space doors about alarm and police.

Metalworking Area

  • Coordinate with PCB Rob to bring in additional equipment.
  • Design Rob has welding table design from online - build welding table
  • Unpack remaining items/tooling for milling/lathe - Thank Gabe
  • design ventilation filtration system
  • label metalworking shelving - and organize
  • figure out what metal screws are needed in radioshack cabinet. What should we stock?
  • Move old woodworking shelf as temporary material storage
  • design/build new metal material storage rack (low priority, use old wood rack for now)
  • put feet on temporary metal storage rack
  • paint wall above welding area flat black

Woodworking Area

  • unpack/organize hand tools
  • design/build stand for drill press
  • design/build wood storage
  • design dust collection system
  • label hack-rack in woodworking area
  • label woodworking tool storage
  • figure out what wood screws are needed in radioshack cabinet. What should we stock?
  • design/build outfeed table for tablesaw
  • design/build new base for planer
  • center up light over storage area

Arts/Crafts

  • unpack boxes and relocate to shoebox bins (nothing should remain on member storage shelves) Thanks Joe!
  • design/build sewing table with storage for sewing machines and supplies
  • what should 4th table be? Another work table? another sewing table? Leatherworking/other?
  • Replace table-tops for work tables. LDPE $51 each @ piedmont plastics.

Electronics

  • unpack items and sort into shoebox bins - Partially finished
  • find home for radioshack shelves One bin remaining. Good use for it?

Classroom

  • locate and mount projector screens
  • locate and mount projector(s)
  • unstack chairs
  • attach tabletop to table
  • relocate track lighting
  • paint rear wall in space monochrome color to not look shabby

General

  • repair light fixture on arts/crafts table. Ends fixed, needs new ballast.
  • relocate lighting on front table
  • relocate lighting in arts/crafts area to one per table (four tables by design) - Partially finished
  • relocate lighting in classroom (after projector/screen location)
  • set up wireless network (do we have the appropriate routers for what we need?)
  • get tools working on network again (3d printer/laser cutter)
  • add sign to network?
  • hang posters/signs/other decorations
  • use new modem for wireless?
  • add printer to network
  • break down cardboard boxes
  • load up extra shelf parts and put in storage
  • repair air compressor cart

Non-specific

  • Lasercut/Magnetic member storage signs?
  • make signs for member storage area that indicate storage on top of shelves not permitted
  • design 3D printable part that can be used as divider in radioshack cabinets Maybe just use boxes with flat dividers, rather than labeled dividers.