1. <s>Located on the ceiling between Machining and Metalworking.</s>  <span style="color:green">[DONE]</span>
{| class="wikitable" style=""
 
|-
2. Located on the wall between wood and metal (on the wood side).  The mounting bracket is already mounted on the wallPOE will need to be run here and an AP will need to be attached to the bracket.
! LABEL !! LOCATION !! STATUS
 
|-
3. <s>Located in the back of the classroom.</s>  <span style="color:green">[DONE]</span>
| 1 || Ceiling between Machining and Metalworking || <span style="color:green">[COMPLETED]</span>
 
|-
4. Located on the ceiling of Arts & CraftsCable run has been started.
| 2 || Wall between Wood and Metal (on wood side) || Mounting bracket mounted.   
 
|-
5. <s>Located high on a post in 3D zone.</s> <span style="color:green">[DONE]</span>
| 3 || Back of Classroom || <span style="color:green">[COMPLETED]</span>
 
|-
A. This is the old AP in Bay 3.  It will need to be removed once all the new AP are activated.
| 4 || Ceiling of Arts & Crafts || Cable run started
 
|-
B. Located on top of the server cabinet in the Classroom.  Also to be removed when new AP are activated.
| 5 || High on post in 3D zone || <span style="color:green">[COMPLETED]</span>
|-
| A || Old AP in Bay 3 || Not removed yet
|-
| B || Old AP on server cabinet in Classroom || Not removed yet
|}


=Access Points=
=Access Points=

Revision as of 14:15, 28 May 2022


About

This task is to add four additional wireless access points (for a total of 5) in the space and decommission 2 older access points.

This is a pretty straight forward task if you have run network cabling before. Each AP will need an independent run leading back to the server cabinet therefore the most time consuming part will be neatly running the wire along the ceiling to the desired AP locations.

TODO

Km-ap-plan.png

LABEL LOCATION STATUS
1 Ceiling between Machining and Metalworking [COMPLETED]
2 Wall between Wood and Metal (on wood side) Mounting bracket mounted.
3 Back of Classroom [COMPLETED]
4 Ceiling of Arts & Crafts Cable run started
5 High on post in 3D zone [COMPLETED]
A Old AP in Bay 3 Not removed yet
B Old AP on server cabinet in Classroom Not removed yet

Access Points

Newaps.jpg

Thew new access points are in a box in front of the cabinet in the classroom. They are already configured. All they need is POE connected to the Local network switch.

Cable and Tools

Cable-tools.jpg

In front of the server cabinet in the classroom is a box of cat5e cable and ethernet termination tools, tester, and supplies.


Switches

IF YOU DO NOT FEEL COMFORTABLE HOOKING THIS UP PLEASE LEAVE IT FOR SOMEONE ELSE TO HOOK UP.

Incorrectly plugging this in can damage equipment. Since 99% of this task is running the cable, leaving this for someone else is not a big deal.

Newapswitchesb.png

In the server cabinet in the classroom are a lot of things but of interest for this task are the switches highlighted and labeled A and B in this picture. The organization of these cables is shameful. Fixing that is outside the scope of this task and will be another task.

A. A POE injector switch. Source ethernet goes in on the top row and powered ethernet comes out of the bottom row.

B This is the source switch for our local network.