New Space To Do
Jump to navigation
Jump to search
Break Area
- Take out recycling
- Add signage to space doors about alarm and police.
Metalworking Area
- Coordinate with PCB Rob to bring in additional equipment.
- Rob has welding table design from online - build welding table
- design filtration system
- label metalworking shelving - and organize
- figure out what metal screws are needed in radioshack cabinet. What should we stock?
- Rotate old wooden storage for metalworking
- design/build new metal material storage rack (low priority, use old wood rack for now)
- add new circuits for tools
Woodworking Area
- unpack/organize hand tools
- build stand for drill press
- label hack-rack in woodworking area
- label woodworking tool storage
- figure out what wood screws are needed in radioshack cabinet. What should we stock?
- Finish outfeed table for tablesaw
- finish new base for planer
- add new circuits for tools
Arts/Crafts
- build sewing table with storage for sewing machines and supplies
Classroom
- add new electrical
Electronics
- add new circuit
General
- get tools working on network again (3d printer/laser cutter)
- hang up laser cut gear board
- use new modem for wireless?
- break down cardboard boxes and take to recycling
- unload extra shelf parts
- Add new circuit and hang emergency lighting
Non-specific
- Lasercut/Magnetic member storage signs?
design 3D printable part that can be used as divider in radioshack cabinetsMaybe just use boxes with flat dividers, rather than labeled dividers.