MendelMax Build Notes

From Knox Makers Wiki
Revision as of 16:09, 19 January 2013 by Laz (talk | contribs) (Created page with "Notes from the Mendel Max Build, Jan 19, 2013: Actions performed: *Tapping all of the Al extrusions took considerable time. Everyone should be tapping together, or the pieces sh...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Notes from the Mendel Max Build, Jan 19, 2013: Actions performed:

  • Tapping all of the Al extrusions took considerable time. Everyone should be tapping together, or the pieces should be untapped. Note: This step could, and perhaps should be performed ahead of time if we have a larger class. Tapping one set takes approximately 1 hour for one set.
  • The heated platforms needed the lead wires soldered on. This step takes approximately 15 minutes per kit to strip the wires, tin them, and solder them to the build platform.
  • The steel rods for the bearings needed to be cut and finished. It took approximately 1.5 hours to do this for three printers.
  • Loading firmware to the Arduino boards was the next step.