==Break Area==
==Break Area==
*<s>Replace burned-out 4' lamps</s>
*Add signage to space doors about alarm and police. (is this in addition to the piece of paper that is by the door?  Yes.  Label the doors so people know he alarm goes off if the doors open.)
*<s>clean up 8' table</s>
 
*<s>find home for microwave</s>
* <s>do we get rid of coffee equipment?  Hasn't been used in years </s>  Find a home for coffee stuff.
* <s>reduce shelving density in small shelves by entrance</s>
*Add signage to space doors about alarm and police.


==Metalworking Area==
==Metalworking Area==
*Coordinate with PCB Rob to bring in additional equipment.
*Organize Metalworking area into final configuration
* <s>Design</s> Rob has welding table design from online - build welding table
*finish build of filtration system
* <s>Unpack remaining items/tooling for milling/lathe </s> - Thank Gabe
*design <s>ventilation</s> filtration system
*label metalworking shelving - and organize
*label metalworking shelving - and organize
*figure out what metal screws are needed in radioshack cabinet.  What should we stock?
*figure out what metal screws are needed in radioshack cabinet.  What should we stock?
*<s>Move old woodworking shelf as temporary material storage</s>
*find filter for metal shopvac (does this need a cloth/paper type filter? or are most metals heavy enough that we don't need a filter? or I may be missing the point)[Answer: a simple paper filter will be fine.  It'll stop smaller dust from fouling out the motor]
*design/build new metal material storage rack (low priority, use old wood rack for now)
*Build/buy broom station to hold brooms and dustpan
*<s>put feet on temporary metal storage rack</s>
*<s>paint wall above welding area flat black</s>


==Woodworking Area==
==Woodworking Area==
*unpack/organize hand tools
*add lighting to woodworking shelves
*design/build stand for drill press
*design/build wood storage
*design dust collection system
*label hack-rack in woodworking area
*label woodworking tool storage
*label woodworking tool storage
*figure out what wood screws are needed in radioshack cabinet.  What should we stock?
*figure out what wood screws are needed in radioshack cabinet.  What should we stock?
*design/build outfeed table for tablesaw
*Design/build chopsaw station
*design/build new base for planer
*Finish connection dust collection system.  Seal all joints.
*center up light over storage area
*Modify belt sander to accept larger dust collection ports
*modify Band Saw to accept larger dust collection port
*Design/build dust collection hood for drill press
*Build support for dust collection drop to table saw.


==Arts/Crafts==
==Arts/Crafts==
* <s>unpack boxes and relocate to shoebox bins (nothing should remain on member storage shelves) </s> Thanks Joe!
*Get art supplies together for open art night
*design/build sewing table with storage for sewing machines and supplies
*Add leather working station
*what should 4th table be?  Another work table? another sewing table? Leatherworking/other?
*Build 3rd work table (one just like the low table?)
*Replace table-tops for work tables.  LDPE $51 each @ piedmont plastics.
*Get plastic top for work table and leather working table
*add one new circuit to poles next to tables to power the strips on each table
*clean out underneath the tables
*Build/buy broom station to hold brooms and dustpan
 
==Classroom==
*add additional circuits or cord reels to allow more electrical usage in classroom for laptops/soldering irons, etc


==Electronics==
==Electronics==
*<s>unpack items and sort into shoebox bins - Partially finished</s>
*<s>find home for radioshack shelves </s> <s>One bin remaining.  Good use for it?</s>


==Classroom==
*<s>locate and mount projector screens</s>
*locate and mount projector<s>(s)</s>
*unstack chairs
*<s>attach tabletop to table</s>
*relocate track lighting
*<s>paint rear wall in space monochrome color to not look shabby</s>


==General==
==General==
*<s>repair light fixture on arts/crafts table.  Ends fixed, needs new ballast. </s>
*Add new circuit and hang emergency lighting
*<s>relocate lighting on front table </s>
*Get fire extinguishers
*<s>relocate lighting in arts/crafts area to one per table (four tables by design) - Partially finished</s>
*add emergency release cable to roll-up door
*relocate lighting in classroom (after projector/screen location)
*label hack-rack
*<s>set up wireless network (do we have the appropriate routers for what we need?)</s>
*add cleaning stations to every area (broom, dustpan)
*get tools working on network again (3d printer/laser cutter)
*<s>add sign to network?</s>
*hang posters/signs/other decorations
*use new modem for wireless?
*add printer to network
*break down cardboard boxes
*load up extra shelf parts and put in storage
*repair air compressor cart


==Non-specific==
==Non-specific==
*Lasercut/Magnetic member storage signs? 
*Write a calendar-scraping screen hack for farnsworth
*make signs for member storage area that indicate storage on top of shelves not permitted
*Fix Farnsworth
*<s>design 3D printable part that can be used as divider in radioshack cabinets</s> Maybe just use boxes with flat dividers, rather than labeled dividers.
 
==Closing out Old Space==
*Put in Change of Address with Post Office
*Clean final items out of old space
*Put in basic repair work to have best chance of getting deposit back after final inspection
*<s>Cancel or put in Stop Payment on Tech 2020 Internet Service auto ACH withdrawal</s>
*<s>Schedule final inspection with City of Oak Ridge</s>
*<s>Post pics of final items in Member Storage and give folks deadline to claim before anything remaining is tossed</s>
*<s>Stop service with City of Oak Ridge Utilities</s>
*<s>Stop service with ORUD Gas</s>

Latest revision as of 20:57, 23 April 2017

Break Area

  • Add signage to space doors about alarm and police. (is this in addition to the piece of paper that is by the door? Yes. Label the doors so people know he alarm goes off if the doors open.)


Metalworking Area

  • Organize Metalworking area into final configuration
  • finish build of filtration system
  • label metalworking shelving - and organize
  • figure out what metal screws are needed in radioshack cabinet. What should we stock?
  • find filter for metal shopvac (does this need a cloth/paper type filter? or are most metals heavy enough that we don't need a filter? or I may be missing the point)[Answer: a simple paper filter will be fine. It'll stop smaller dust from fouling out the motor]
  • Build/buy broom station to hold brooms and dustpan

Woodworking Area

  • add lighting to woodworking shelves
  • label woodworking tool storage
  • figure out what wood screws are needed in radioshack cabinet. What should we stock?
  • Design/build chopsaw station
  • Finish connection dust collection system. Seal all joints.
  • Modify belt sander to accept larger dust collection ports
  • modify Band Saw to accept larger dust collection port
  • Design/build dust collection hood for drill press
  • Build support for dust collection drop to table saw.

Arts/Crafts

  • Get art supplies together for open art night
  • Add leather working station
  • Build 3rd work table (one just like the low table?)
  • Get plastic top for work table and leather working table
  • add one new circuit to poles next to tables to power the strips on each table
  • clean out underneath the tables
  • Build/buy broom station to hold brooms and dustpan

Classroom

  • add additional circuits or cord reels to allow more electrical usage in classroom for laptops/soldering irons, etc

Electronics

General

  • Add new circuit and hang emergency lighting
  • Get fire extinguishers
  • add emergency release cable to roll-up door
  • label hack-rack
  • add cleaning stations to every area (broom, dustpan)

Non-specific

  • Write a calendar-scraping screen hack for farnsworth
  • Fix Farnsworth